Stinson Ave & West Monte Vista Ave Sewer & Water Improvements Project

The general scope of work includes the installation of approximately 2,300 linear feet of 12-inch PVC C900 waterline, the abandonment of approximately 2,400 feet of existing waterline, and the installation of various gate valves. The project also involves reconnecting existing ACP water mains and services of various sizes, installing and removing fire hydrant assemblies, and upsizing a total of approximately 3,600 linear feet of existing VCP sewer mains to 12-inch, 15-inch, or 18-inch PVC SDR 26 through open-cut methods. Additionally, the scope includes the replacement of sewer manholes, the construction of connections to existing 4-inch and 6-inch sewer mains and laterals with cleanouts, the reconstruction of pavement and striping, and all ancillary work required by the Project Plans and Special Provisions.
Addendum 1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
1038 Stinson&MonteVista_Sewer&Water_Plans_Final_Ad #1 13.3 MB
CIP #1038 Addendum#1 326.3 KB
CIP 1038 Bid Proposal Ad #1 461.4 KB
CIP 1038 Sample Contract Ad #1 433.7 KB
Addendum 2 (click to expand/collapse)
Name Size
1038 Addendum #2 576.5 KB
Addendum 3 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
CIP #1038 Addendum#3 161.2 KB
CIP 1038 Bid Proposal #3 440.8 KB