Ulatis Creek Bank Repair Phase #1 Project

The general description of work includes: Clearing and Grubbing, excavation, construction of soldier pile retaining wall, placement of rock slope protection, relocation and installation of irrigation, and revegetation.
Addendum 1 (click to expand/collapse)
Name Size
CIP #983 Addendum#1-2024.05.14 4.3 MB